| ICSD
Board of Education Sustainability and Energy conservation
Resolution
WHEREAS, Students and staff are entitled
to safe and well maintained school facilities; and
WHEREAS, the
Ithaca City School District (ICSD) Board of Education (BOE)
has approved a major facilities bond resolution consisting
of two propositions that include renovation projects at all
our schools and bus garage and building additions at three
of our schools; and
WHEREAS, these
projects include but are not limited to roofs, HVAC systems,
electrical upgrades, window replacements and new building
additions; and
WHEREAS, the
plans and architectural drawings for these projects have not
yet reached the design stage; and
WHEREAS, there
has been significant community interest in environmental sustainability
and energy conservation; and
WHEREAS, school
districts should employ design, construction and operation
strategies that minimize facilities operating costs and maximize
energy efficiency without compromising educational programs;
NOW, THEREFORE, BE
IT RESOLVED by the Board of Education of the City
School District of the City of Ithaca as follows:
That the District will integrate
NYSERDA programs into District building plans and operations
wherever appropriate; and
That integrated building
design techniques, where applicable, will be a part of the
design phase of each project with the intent to build and/or
renovate following the NYS Collaborative for High Performance
Schools (CHPS) standard.
printable
pdf
|